Download our Brochures

Download now

Chris Staddon, Anglesey County Council

“Very impressed with the service I received from start to finish, very professional and customer focused and will certainly use your service again if the need arises in the future.”

PVH Europe – Tommy Hilfiger, Matthew Hawley

“I was very impressed with the level of service from Tracy and the installation team.”

Arts University Bournemouth – Katherine Pell

“We are extremely happy with our new roller racking system and delighted with the repairs that your installation team were able to make to our existing shelving system which had deteriorated over the years. This is the second time we have used Rackline and I have already recommended the company to a colleague. The store was left in a clean and tidy state such that we were able to resume normal working activities immediately. Thank you.”

Chris King, East and North Hertfordshire NHS Trust

“The whole project was approached and dealt with in a very professional manner, at no time was there any concerns from either party of what was required and how it was to be done. Work was carried out very efficiently with the minimum of fuss and with no disruption to the Hospital’s activities. Your work forces were polite, efficient and helpful, All in all it was an extremely smoothly exercised project.”

Acorn Health Partnership – Amy Taplin

“Following a large scale merger involving three sites, our existing static shelving solutions were not fit for purpose. We needed a solution that would be able to house the Lloyd George notes of all three patient lists on one site. Our new high density mobile shelving with the Lloyd George trays was the perfect solution and now can search through our 45k patient records with ease. We have also gained back two rooms that can now be used to house some of our administrative staff which has been a huge added bonus.”

University of Dundee Museum Services – Matthew Jarron

“Looks great – transformed the space!”

County Durham and Darlington NHS Foundation Trust – Stephen Dodd

“The shelving at our Darlington Medical Library was old and dated. We previously purchased Rackline shelving for our new library at Durham. We were happy with this shelving and decided to revamp the library at Darlington using the same shelving. The shelving and design has really opened up the library and made it a much more modern and nicer place for students to study.”

Colchester Borough Council, Museums, Tom Hodgson

“Rackline offered us a bespoke and competitively priced design that suited the particular demands of our site. The design team were approachable and flexible, finding effective solutions to all the issues, such as awkwardly placed columns in many of the storerooms, that arose during the project. The installation team carried out their work to plan with a minimum of disruption.”

Gary Malkin, Baltic Centre for Contemporary Art

“Very satisfied.  The new space was a little larger than was originally measured.  The workmen made sure this space was utilized by giving us extra room between aisles. This makes the system much easier to use. They also worked closely with our Building Services team to ensure that our under floor electrics and data were still easily accessible.

I’ve had so many positive comments from people using the new archive space. It’s like having a new system rather than a relocated one.”

Emily Naish, Salisbury Cathedral

“Overall, this was a challenging project in a non-standard space which during the course of the project also emerged to have problems with the load bearing capacity of the floor. Everyone at Rackline was extremely helpful in finding a solution to these difficulties and liaising with our structural engineer. I am very pleased with the final installation.”